rgb_is-2027-logos-and-branding_is-2027-logotype-negative
Oct 19-21, 2027 Wynn Las Vegas, NV PRE-REGISTER NOW!

American Electric Power reports 2Q24 results; shares data points on data centre demand

  • August 12, 2024
  • Analyst: Philbert Shih

Ohio-based American Electric Power disclosed its 2Q24 results, which provided details on the demand for power coming from the data centre space.

or